Requirements for Construction or Reconstruction of a Reprocessing Unit for Medical Devices (RUMED): Part 11: Heating, ventilation and air conditioning (HVAC) system in a RUMED

Part 11: Heating, ventilation and air conditioning (HVAC) system in a RUMED

Authors: A. Jones (Coordinator), A. Carter, U. Haffke, G. Lehnert, M.-TH. Linner, S. Lutzenberger, M. Schick-Leisten, H. Schunk, R. Stens, A. Wentzler, K. Wiese; Email: hbt@dgsv-ev.de

Part 11 of the publication series “Requirements for Construction or Reconstruction of a Reprocessing Unit for Medical Devices (RUMED)” focuses on the heating, ventilation and air conditioning (HVAC) system in a RUMED.

Download this recommendation here.

SW-NL-Banner

Please enter these characters in the following text field.

The fields marked with * are required.

Related products
Dies ist ein Testtitel
PDF issue 06/2019 
PDF issue - Zentralsterilization 06/2019
€15.00 *
Guideline 05/2017
DGKH, DGSV, AKI 
Guideline 05/2017
€14.00 *
Guideline 05/2017-ePaper
DGKH, DGSV, AKI 
Guideline 05/2017-ePaper
€6.99 *