Requirements for construction or reconstruction of a Reprocessing Unit for Medical Devices (RUMED) - Part 4

Authors: A. Jones (Coordinator), Dr. M.-Th. Linner (Coordinator), A. Carter, U. Haffke, S. Lutzenberger, Dipl. Ing. M. Scherrer,
Dipl. Ing. A. Wentzler, K. Wiese
E-mail: hbt@dgsv-ev.de

Introduction
Part 4 of the publication ”Requirements for construction or reconstruction of a Reprocessing Unit for Medical Devices (RUMED)“ focuses on equipping and furnishing the rooms and is a continuation of Parts 1, 2 and 3 of this series of publications. Based on experiences from everyday practice, it summarizes and characterizes by way of example the limited number of rather unspecific provisions given in the pertinent recommendations/guidelines/standards on furnishing and equipping a RUMED.
No information is provided on fire protection, structural physics, structural engineering or the various utility installations (e.g. gas, water and electricity connections, etc.)

Download the recommendation here: FA_Bau_en_ZT_4_16

Please enter these characters in the following text field.

The fields marked with * are required.